Hammersmith Bridge fiasco as cost of repairing Thames crossing soars to £250million

[ad_1]

The bridge, a Grade II*-listed iron structure that opened in 1887, used to carry about 22,000 vehicles a day and seven bus routes. It was closed in April 2019 by Hammersmith and Fulham council after safety sensors on the bridge, which links Hammersmith and Barnes, detected “dangerous micro-fractures” in the pedestals that hold the suspension system in place.

[ad_2]

Source link